Click anywhere to close.

Moat Lane Junction - Talyllyn West Jct.

Date Closed to Passenger Services

31 Dec 1962

Mileage Closed

55m 79c*

Stations Closed

Moat Lane Junction; Moat Lane (03/01/1863); Llandinam; Dolwen Halt; Llanidloes (1st) (01/1862); Llanidloes (2nd); Tylwch Halt; Glan-yr-Afon Halt; Pantydwr; St. Harmons; Marteg Halt; Rhayader; Doldowlod; Newbridge-on-Wye; Builth Road (Low Level); Builth Wells; Llanfaredd Halt; Aberedw; Erwood; Llanstephan Halt; Boughrood & Llyswen; Three Cocks Junction; Talgarth; Trefeinon Halt; Llangorse Lake Halt; Talyllyn (1878); Talyllyn Junction**

Services Operated

Moat Lane Junction - Llanidloes/Builth Wells/Brecon; Builth Road (Low Level)/Builth Wells - Three Cocks Junction/Brecon; Hereford - Three Cocks Junction - Brecon

Timetable Reference

BR(WR) 10 Sep 62 - 16 Jun 63 Table 185

Cobb Atlas Reference

260 04 91 - 164 10 27

Map

RCH RJD154 1912

Further Notes

ACD - Mon 31/12/1962 - PNM 1980 p22. No Sunday service, LTR - 29/12/1962.

*Mileage from Moat Lane Junction station. Trains to Brecon operated from a dedicated on-branch platform. The station closed with the Brecon line as its raison d'être ceased.

**Talyllyn Junction station was actually located west of West Jct. on the line towards Brecon. A short platform was provided, however, just to the east side of the junction on the curve to North Jct. in the Hereford direction only, presumably to facilitate connections. (See Llyn Syfaddan History Group website for some interesting and excellent plans, diagrams, drawings and photos.)

 

Page updated: 25/04/2022